Free Estimate 📞 (877) 586-1316 24/7
โ˜…โ˜…โ˜…โ˜…โ˜… 4.8 Stars ยท 397+ Reviews

Services | Falls Roofing & Maintenance | Falls, PA

Same-Day Appointments Available  ยท  24/7 Emergency Service

Falls Roofing & Maintenance in Falls, PA โ€” Professional Roofing services. Call (877) 586-1316.

Call (877) 586-1316
📞 (877) 586-1316
Same-Day Service Licensed & Insured Free Estimates
<60 Min
Response Time
14+
Years Experience
4.8
Star Rating
397+
Happy Reviews

Services | Falls Roofing & Maintenance | Falls, PA

We've been providing roofing services to Falls homeowners and businesses for 14 years. From repairs to full replacements. It's all we do, and we do it right.

roof replacement

Roof Replacement

The average roof replacement in Falls takes one day for a standard residential home. Larger or steeper roofs might take two. Either way, we don't leave a house uncovered overnight. If we tear it off, we cover it before we leave. No exceptions.

Get a Free Quote โ†’
roof repair

Roof Repair

Improper step flashing is the leading cause of roof leaks at wall-to-roof transitions. Step flashing needs to be woven between shingle courses with each piece extending 4" above the shingle exposure. We see Falls homes where the last roofer used continuous L-flashing or just caulked the gap. That always fails. We tear it out and install proper step flashing with a kick-out diverter at the bottom per IRC R905.2.8.3.

Get a Free Quote โ†’
storm damage repair

Storm Damage Repair

Storm damage is time-sensitive. Most insurance policies in Pennsylvania require claims within 12 months. We do a free inspection, document every damaged area with photos and measurements, and help you file the claim. If the adjuster approves it, we handle the repairs at the insurance-approved price.

Get a Free Quote โ†’
new roof installation

New Roof Installation

New construction underlayment per IRC R905 and ASTM D226 (felt) or ASTM D6757 (synthetic). Ice barrier per ASTM D1970 required at eaves in climate zones with average January temperature below 25ยฐF. We install ice and water shield regardless. It's cheap insurance against ice dams and wind-driven rain. Drip edge per IRC R905.2.8.5 on eave and rake edges. Proper starter strip with factory sealant for wind resistance from day one.

Get a Free Quote โ†’
metal roofing

Metal Roofing

Standing seam metal with Kynar 500 PVDF fluoropolymer finish. The gold standard for color retention and chalk resistance. We install Sheffield Metals and McElroy Metal panels in 24-gauge Galvalume steel. UL 2218 Class 4 impact resistance (qualifies for insurance discounts in most Pennsylvania markets). UL 790 Class A fire rating. Wind uplift rated to 140+ mph per ASTM E1592 testing. Concealed Z-clips allow thermal expansion without stress on fasteners. That's what makes standing seam leak-proof.

Get a Free Quote โ†’
shingle roofing

Shingle Roofing

GAF Timberline HDZ. The best-selling shingle in North America. With StrikeZone nailing area for consistent fastener placement. Class A fire rating per UL 790, Class 4 impact resistance per UL 2218 (when installed in the GAF Roof System), and Class H wind rating per ASTM D7158 (130 mph). We install Timberline in the full GAF system to qualify for Golden Pledge warranty: 25-year non-prorated workmanship plus 50-year materials with WindProven limited wind warranty (no max speed). That warranty is why we recommend GAF for most Falls homes.

Get a Free Quote โ†’
flat roofing

Flat Roofing

The number one cause of flat roof failure is ponding water. Standing water that doesn't drain within 48 hours after rain. We solve ponding by installing tapered insulation systems that create positive slope to drains, scuppers, or roof edges. Minimum 1/4" per foot of slope eliminates standing water.

Get a Free Quote โ†’
commercial roofing

Commercial Roofing

Commercial roof maintenance programs keep small problems from becoming big ones. We offer annual and semi-annual inspection contracts for Falls building owners. We find and fix issues before they cause interior damage to your inventory, equipment, or tenant spaces.

Get a Free Quote โ†’
gutter installation

Gutter Installation

Half-round copper gutters with round downspouts are the premium install for historic and high-end homes in Falls. We solder every joint on-site with 50/50 tin-lead solder. Copper weathers to a green patina in Pennsylvania's climate over 5-7 years. For modern aluminum installs, we use Spectra Metals .027 gauge seamless stock in 25+ color options with Raytec hidden hangers rated to 25 lbs per linear foot of combined debris and ice load.

Get a Free Quote โ†’
roof inspection

Roof Inspection

Our 27-point residential roof inspection: (1) shingle condition and granule loss, (2) nail pops, (3) lifting tabs, (4) ridge cap integrity, (5) valley flashing, (6) step flashing at walls, (7) chimney flashing and counter-flashing, (8) drip edge condition, (9) pipe boot seals, (10) plumbing and HVAC vent integrity, (11) ridge vent function, (12) soffit ventilation, (13) gutter pitch and capacity, (14) downspout drainage, (15) fascia condition, (16) soffit condition, (17) ice dam evidence, (18) moss or algae growth, (19-27) attic: decking moisture, insulation displacement, rafter condition, bathroom exhaust routing, daylight penetration, ventilation balance, mold indicators, pest intrusion, previous repair evidence. Written report with annotated photos emailed same day.

Get a Free Quote โ†’
emergency roof repair

Emergency Roof Repair

Emergency protocol for active water intrusion: (1) interior containment. Buckets, plastic sheeting, water extraction if accessible, (2) exterior tarping with 20x30 heavy-duty poly sheeting over damaged area extending minimum 4 feet past damage on all sides, (3) secure with 2x4 nailer boards lag-screwed to the roof deck (not through shingles), (4) secondary tarp overlap for multi-section damage, (5) document with timestamped photos for insurance. Permanent repair scheduled within 48-72 hours once materials are sourced.

Get a Free Quote โ†’
skylight installation

Skylight Installation

VELUX FS (fixed) and VS (vented) skylights installed with EDL flashing kits for shingle roofs. The multi-step flashing integrates with the surrounding shingle courses per IRC R903.2. We frame the curb with doubled 2x8 or 2x10 lumber (depending on rafter depth), install ice and water shield membrane around the entire curb perimeter, then set the skylight with factory sealant before weaving step flashing into the field. Top headwall flashing tucks under the upslope shingle course. Bottom sill pan diverts water onto the downslope shingles. Zero exposed sealant joints. Mechanical flashing only.

Get a Free Quote โ†’

SAME-DAY APPOINTMENTS AVAILABLE

Get Your Free Roof Inspection Today

24/7 emergency service. Most appointments available within 48 hours.

📞 Call (877) 586-1316

โ˜…โ˜…โ˜…โ˜…โ˜… 4.8/5 from 397+ Reviews  ยท  Licensed  ยท  Insured